Answer:
C = 1.75Q + 4,990
variable 1.75
fixed component 4,990
Explanation:
High-Low method:
we subtract the highest level of activity with the lowest one:
[tex]\left[\begin{array}{ccc}High&44,360&82,620\\Low&19,962&39,924\\Difference&24,398&42,696\\\end{array}\right][/tex]
24,398 units generates 42,696 cost
with this information we can solve for variable cost.
42,696 / 24,398 = 1.75
Now we calcualte the fixed cost:
TC = variable x Q + fixed cost
82,620 = 1.75 (44,360) + fixed cost
82,620 - 77630 = 4990
the formula will be:
C = 1.75Q + 4,990