Answer: Long answer...
Explanation: As soon as Isaac has filled 670 cans on the conveyor belt, Albert starts putting lids on the cans at the other end of the production line. As Albert finishes closing each can, he moves up along side the conveyor belt to meet the next can. Albert puts lids on 50 cans per minute.