Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data:Total machine-hours 30,400Total fixed manufacturing overhead cost $ 425,600Variable manufacturing overhead per machine-hour $ 5Recently, Job T687 was completed with the following characteristics:Number of units in the job 10Total machine-hours 20Direct materials $ 590Direct labor cost $ 1,180The total job cost for Job T687 is closest to ____