Average cost is:
a. (variable cost)/(quantity).
b. (fixed cost)/(quantity).
c. (total cost)/(change in quantity).
d. (change in total costs)/(change in quantity).
e. (total cost)/(quantity).
f. (change in total costs)/(quantity).