Answer:
The correct answer is option 2.
There is insufficient information to determine the process specification.
Explanation:
There is insufficient information to determine the process specification
CpK = Min(CpU, CpL)
CpU = (Upper Specification Limit - Mean)/3*Standard Deviation
CpL = (Mean - Lower Specification Limit)/3*Standard Deviation
Hence, as both upper Specification Limit and lower specification limit is not mentioned, it cannot be measured.