Problem 8-12 (Algo) A firm uses a serial assembly system and needs answers to the following: a. An output of 800 units per shift (8.00 hours) is desired for a new processing system. The system requires product to pass through four stations where the work content at each station is 32 seconds. What is the required cycle time for such a system